Commercial & Industrial Solar

Industrial Solar Power Plant — Zero Load Shedding, Maximum Savings for Factories

Industrial solar plants — typically 100 kW to 1 MW+ — are designed to slash the largest line-item on a factory's P&L: electricity. Tamil Nadu HT industrial tariffs already exceed ₹8/unit, and rooftop or ground-mount solar can cap your blended energy cost at ₹3.5–₹4.5/unit for 25 years.

What is Industrial Solar (Factories, Warehouses)?

Industrial solar plants — typically 100 kW to 1 MW+ — are designed to slash the largest line-item on a factory's P&L: electricity. Tamil Nadu HT industrial tariffs already exceed ₹8/unit, and rooftop or ground-mount solar can cap your blended energy cost at ₹3.5–₹4.5/unit for 25 years. We design with central or string inverters, HT/LT interface panels, lightning arrestors, monsoon-grade mounting and SCADA monitoring. CAPEX, OPEX (PPA) and corporate-PPA models are all available — including zero-investment options where Gensolar finances the plant and you simply pay per unit consumed. Open-access wheeling can also bank energy generated at remote sites to your factory meter.

How It Works

1

Free Site Survey

Energy audit + roof / land survey + sanctioned-load review.

2

Custom Design & Quote

Capex / Opex / Corporate-PPA financial model + design.

3

Installation & Net-Metering

Civil + electrical install, HT switchgear, net-metering, NOCs.

4

Monitoring & Support

SCADA monitoring, AMC and warranty management.

Benefits

Cap HT Tariff
Lock energy cost at ~₹4/unit for 25 years.
OPEX Model Available
Zero upfront — pay only per unit, lower than grid.
Corporate PPA
Open-access banking from off-site solar farms.
Carbon Credits
Monetise verified emission reductions.
ROI 4–5 Years
Then 20+ years of free or low-cost power.
Brand & ESG Wins
Visible sustainability for customers and lenders.

Who It's For

  • Manufacturing units & MSMEs
  • Cold storages & warehouses
  • Textile & dyeing units
  • Auto-component & tannery clusters

Pricing Guide

Indicative ranges — final quote provided after free site visit.

SystemSuitable ForEst. CostAnnual Savings
100 kWMSME factory₹50,00,000₹11,50,000
250 kWMid-size unit₹1,20,00,000₹28,75,000
500 kWLarge factory₹2,30,00,000₹57,50,000
1 MWIndustrial cluster₹4,40,00,000₹1,15,00,000

TANGEDCO HT tariff savings, OPEX model available (zero upfront investment), corporate PPA options.

Recent Installations

Ranipet — leather tannery
250 kW
₹28 L/year
Tiruvallur — auto components
500 kW
₹56 L/year
Villupuram — cold storage
150 kW
₹17 L/year

Frequently Asked Questions

Get a quote for Industrial Solar (Factories, Warehouses)

We'll call you within 2 hours with a fixed price.

Tagged: Industrial Solar (Factories, Warehouses)

Free site survey · No obligation · Reply within 2 hours